TechnipFMC awarded iEPCI contract by Woodside Energy for Xena Phase 3 development
TechnipFMC has been awarded an integrated engineering, procurement, construction and installation (iEPCI) contract by Woodside Energy in Australia.
TechnipFMC will design, manufacture, and install the subsea production system, flexible pipe and umbilicals for the Xena Infill well (XNA03) to support ongoing production from the Pluto LNG Project. The award follows an integrated front-end engineering design (iFEED) study.
The project will use the Company’s Subsea 2.0 production system. Xena Phase 3 will be tied back to existing subsea infrastructure previously supplied by TechnipFMC.
Jonathan Landes, President, Subsea at TechnipFMC, commented: “We are proud to be delivering a fully integrated project from concept to execution. This project will help our long-term client meet their objectives, demonstrating the favorable impact iFEED, iEPCI and Subsea 2.0® can have on project economics.”
The contract is the latest call-off on the framework agreement between Woodside Energy and TechnipFMC.
Related News
Related News
- Wood leads industry project to accelerate CCUS with guidelines for CO2 specifications
- Gasum selects Wärtsilä for another bio-LNG project in Sweden
- Vaisala seeks to remove greenwashing from carbon capture with new measurement solution
- Vanguard Renewables breaks ground on its first organics-to-renewable gas facility
- Amarinth secures $1-MM order of API 610 pumps for Coral North FLNG project in Mozambique
Comments