The 10th U.S. LNG export terminal, Golden Pass, ships first cargo
Golden Pass LNG—the 10th liquefied natural gas (LNG) terminal in the United States—shipped its first cargo from Train 1, according to the project developer. The shipment left port 23 days after achieving first LNG production in March 2026. The terminal began shipping as geopolitical developments in the Strait of Hormuz have affected over 10 billion cubic feet per day (Bcf/d), or approximately 20%, of global supply. Golden Pass LNG is the only new U.S. LNG export terminal currently expected to begin LNG shipments in 2026.

The project reached a final investment decision in February 2019, although it was delayed when the lead construction contractor field for Chapter 11 bankruptcy in 2024, requiring a new lead contractor to finish the plant. Golden Pass LNG was developed by a JV of QatarEnergy (70% ownership) and ExxonMobil (30% ownership), bearing the same name.
The project consists of three liquefaction trains, each with a nominal capacity of 0.7 Bcf/d and peak capacity of 0.8 Bcf/d. The total nominal capacity of the facility will be 2.0 Bcf/d (2.4 Bcf/d peak capacity). LNG export facilities often operate at more than 100% of their nominal capacity but less than 100% of their peak capacity. When fully complete, the project will have the third-highest nominal capacity of all U.S. LNG export projects currently exporting LNG, behind Sabine Pass (3.6 Bcf/d) and Plaquemines LNG (2.6 Bcf/d). Golden Pass LNG aims to start up Train 2 in the second half of 2026 and Train 3 in the first half of 2027.
Related News
Related News
- Cheniere signs deal with Bechtel to expand U.S. LNG export capacity
- TC Energy approves $1.5-B Columbia Gas expansion after profit tops estimates
- Wärtsilä continues to expand its data center footprint with new 790 MW order in Texas
- Baker Hughes’ fuel flexible NovaLT™ 16 gas turbine certified by RINA for marine propulsion
- U.S. natural gas exports to grow nearly 30% by 2027 as LNG facilities ramp up

Comments