Dutch Gasunie expects first LNG shipment at new floating terminals on Sept. 8 (1)
8/30/2022
(Reuters) - Dutch gas grid operator Gasunie said it expects to receive the first shipment at floating LNG terminals in Eemshaven on Sept. 8.
The two terminals, which have 8 Bcm of capacity, were leased after Russia's invasion of Ukraine and have been expected to commence operation in September.
(Reporting by Toby Sterling; Editing by Kirsten Donovan)
Sign up to Receive Our Newsletter
- Freeport LNG export plant in Texas to take in more natgas after unit shut on Monday
- LNG cool-down vessel arrives at ExxonMobil's Golden Pass plant in Texas
- Freeport LNG export plant in Texas reports shutdown of liquefaction train
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project
- JGC celebrates handed over second production train to LNG Canada

Comments