Shell's floating LNG facility sets sail from South Korea for Australia
6/29/2017
LONDON (Reuters) — Royal Dutch Shell's Prelude floating liquefied natural gas (FLNG) ship has left a shipyard in South Korea for its destination offshore northwest Australia, the company said on Thursday.
![]() |
| Photo courtesy of Shell. |
Shell's $12.6 B Prelude project is expected to start operating next year, the company said, after long delays since the oil major first decided to go ahead with the project in 2011.
Once the facility arrives in Australia, it will be secured to the seabed by mooring chains before it can be connected to the gas field and start operating, Shell said.
The Prelude FLNG was built by a Technip Samsung Heavy Industries consortium in the South Korean shipyard of Geoje.
Reporting by Karolin Schaps; Editing by Elaine Hardcastle
Sign up to Receive Our Newsletter
- Freeport LNG export plant in Texas reports shutdown of liquefaction train
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project
- RWE strengthens partnerships with ADNOC and Masdar to enhance energy security in Germany and Europe
- Five energy market trends to track in 2026, the year of the glut
- Venture Global wins LNG arbitration case brought by Spain's Repsol


Comments