Gas Processing is Produced by Gulf Publishing Company

Your source for technology information for the gas processing industry


Croatia to speed up building of LNG terminal in Adriatic

ZAGREB (Reuters) - Croatia will pass a special law to speed up the construction of a liquefied natural gas (LNG) terminal in the northern Adriatic, Prime Minister Andrej Plenkovic said on Thursday.

Croatia produces more than half of its gas consumption, some 2.5 billion cubic metres (bcm) a year. Once the LNG terminal is built it hopes to be able to supply both its own market as well as central and eastern European countries.

"Our aim (is) to pass a special law as a key message that it is a strategic project for us. We want to better position Croatia on the European energy map and diversify energy sources," Plenkovic told a cabinet session.

The European Union has decided to put the floating LNG terminal on the island of Krk on its list of projects of common interest since it wants to diversify sources of supply and reduce dependence on Russian gas. Brussels will invest 101.4 million euros, or 28 percent of the project's assessed value.

Croatia aims to bring a final investment decision this year and plans to make the terminal operational in early 2020.

However, some local environmental groups and regional authorities have opposed the proposal for the terminal saying it represents a threat to the ecological balance in the sea.

Croatia's plan is to construct a terminal with an initial capacity of 2.6 bcm of gas a year, which could be gradually expanded to as much as 7.0 bcm a year.

(Reporting by Igor Ilic; editing by Alexander Smith)


Copyright © 2018. All market data is provided by Barchart Solutions. Futures: at least a 10 minute delay. Information is provided 'as is' and solely for informational purposes, not for trading purposes or advice. To see all exchange delays and terms of use, please see disclaimer.

                                  CMEGroup                                     Icelogo

FEATURED COLUMNS

Editorial Comment
-Adrienne Blume
At CERAWeek by IHS Markit, held in Houston in March, IEA Director Fatih Birol said that the world would soon see a major second wave of shale gas production from the US in response to higher energy prices and growing demand from India and China.
Regional Focus
-Shem Oirere
Mozambique and Tanzania hold an estimated 180 Tft3 and 57 Tft3 of proven natural gas reserves, respectively.


Maximize Profitability with Advanced Analytics at Natural Gas Processing Plants

Register Now

Incorporating economic data into process modeling is key to optimizing operations and maximizing profits at gas processing plants. However, maintaining optimal operations are often challenging due to changing market dynamics, contract structures and increasing process flexibility. Today, gas processors are leveraging Predictive Control and First Principles models to accurately determine and control the optimal operating targets in real time based on the most current plant conditions and profitability, optimizing recovery of natural gas liquids. Learn how real-time analytics, combined with decision support tools, empower companies to:
•Improve processing margins by up to 5%
•Maximize NGL production through improved availability and optimized process conditions
•Improve compositional control to operate closer to product specifications

May 22, 2018 10am CDT

Register Now

 

Please read our Term and Conditions, Cookies Policy, and Privacy Policy before using the site. All material subject to strictly enforced copyright laws.
© 2018 Gulf Publishing Company.